When a specific depth of soil is removed on a site, what is this process called?

Prepare for the CR-21 Landscapes and Irrigation Test. Utilize flashcards and multiple-choice questions featuring hints and explanations. Get exam-ready!

Multiple Choice

When a specific depth of soil is removed on a site, what is this process called?

Explanation:
Cutting is the process of removing soil to lower the ground to a required depth. In site grading, you cut to create foundations, trenches, or slopes where the existing soil sits above the design level. The material taken out is typically hauled away or reused elsewhere on the site. This differs from filling, which adds soil to raise the ground, and from leveling, which aims to make the surface even and may involve both cutting and filling as needed. Banking would involve piling soil to form an embankment rather than removing it.

Cutting is the process of removing soil to lower the ground to a required depth. In site grading, you cut to create foundations, trenches, or slopes where the existing soil sits above the design level. The material taken out is typically hauled away or reused elsewhere on the site. This differs from filling, which adds soil to raise the ground, and from leveling, which aims to make the surface even and may involve both cutting and filling as needed. Banking would involve piling soil to form an embankment rather than removing it.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy